Bidding Information
Lenape Regional High School District - Phase 2 HVAC-B & C Projects
Owner: Lenape Regional High School District Board of Education
Location: Burlington County
Contract Type: Lump Sum
Architect's Project Number: 8251, 8253, 8256 - AWARDED
Budget: Not provided
Description:
1. CONTRACT FOR MECHANICAL CONSTRUCTION – PROJECT DELINEATION. The scope of the work of the different projects within this bid are as follows. Refer to Architectural Drawing A1.0, “General Notes and Schedules” for a delineation of the areas included within each project referenced below:
LHS PHASE 2 HVAC-B (LHS-13 BAND ROOM)
2. CONTRACT FOR MECHANICAL CONSTRUCTION – GENERAL REQUIREMENTS
a. General Coordination responsibilities including the following:
1) Coordination of the work with other prime Contractors active on the project site. Other Contractors shall act in accordance with the schedule dictated by the Owner, and shall coordinate all construction activities through the General Contractor and Owner, as agreed and accepted by the Owner and Architect.
b. Selective demolition responsibilities included within the scope of the project shall include the following:
1) Removal of wall mounted equipment and furnishings as designated and required to complete the scope of the proposed work
2) Repair, patching and preparation of existing ceiling construction as required to accommodate the proposed construction, and as required to accept the specified finishes.
3) Removal and relocation of existing electrical, plumbing and mechanical systems indicated and required for the performance of the proposed work.
c. Supply and installation of steel roof frames and supports as required to accommodate the proposed mechanical construction. Note that the conditions vary at each area, and are to be field verified.
d. Removal and restoration of acoustical panel ceiling systems, including coordination and sequencing of the work with the owner and other contractors.
e. Patching of building finishes damaged or altered as a result of the work of this contract
f. Patching and repair of roofing finishes. The contractor is advised that roof areas impacted by the work of this contract are under warranty. Repairs and alterations to these roof systems must be performed in strict conformation with the written requirements of the roofing system manufacturer, and performed by a roofing contractor pre-qualified by the roofing system manufacturer.
SHS-PHASE 2 HVAC-B (SHS-06 WOOD SHOP, SHS-22 DUST COLLECTION SYSTEM),
3. CONTRACT FOR MECHANICAL CONSTRUCTION – GENERAL REQUIREMENTS
a. General Coordination responsibilities including the following:
1) Coordination of the work with other prime Contractors active on the project site. Other Contractors shall act in accordance with the schedule dictated by the Owner, and shall coordinate all construction activities through the General Contractor and Owner, as agreed and accepted by the Owner and Architect.
b. Selective demolition responsibilities included within the scope of the project shall include the following:
1) Removal of ceiling mounted air handling equipment, ductwork, supports, hangers, accessories, and as delineated within the contract mechanical drawings, and designated and required to complete the scope of the proposed work
2) Repair, patching and preparation of existing ceiling construction as required to accommodate the proposed construction, and as required to accept the specified finishes.
3) Removal and relocation of existing electrical, plumbing and mechanical systems indicated and required for the performance of the proposed work.
c. Removal and replacement of the existing dust collection system in its entirety. The scope of the work will include patching of existing roof and roof coating systems, as well as interior and exterior masonry wall finishes. Supply and installation of steel roof frames and supports as required to accommodate the proposed mechanical construction. Note that the conditions vary at each area, and are to be field verified.
d. Patching of building finishes damaged or altered as a result of the work of this contract. Patching shall include, but is not limited to masonry alterations and renovations, and painting of renovated, modified or altered wall and ceiling surfaces.
e. Patching and repair of roofing finishes. The contractor is advised that roof areas impacted by the work of this contract are under warranty. Repairs and alterations to these roof systems must be performed in strict conformation with the written requirements of the roofing system manufacturer, and performed by a roofing contractor pre-qualified by the roofing system manufacturer.
CHS-PHASE 2 HVAC-C (CHS-14 WOOD SHOP, CHS-36 DUST COLLECTION SYSTEM)
4. CONTRACT FOR MECHANICAL CONSTRUCTION – GENERAL REQUIREMENTS
a. General Coordination responsibilities including the following:
1) Coordination of the work with other prime Contractors active on the project site. Other Contractors shall act in accordance with the schedule dictated by the Owner, and shall coordinate all construction activities through the General Contractor and Owner, as agreed and accepted by the Owner and Architect.
b. Selective demolition responsibilities included within the scope of the project shall include the following:
1) Removal of ceiling mounted air handling equipment, ductwork, supports, hangers, accessories, and as delineated within the contract mechanical drawings, and designated and required to complete the scope of the proposed work
2) Repair, patching and preparation of existing ceiling construction as required to accommodate the proposed construction, and as required to accept the specified finishes.
3) Removal and relocation of existing electrical, plumbing and mechanical systems indicated and required for the performance of the proposed work.
c. Removal and replacement of the existing dust collection system in its entirety. The scope of the work will include patching of existing roof and roof coating systems, as well as interior and exterior masonry wall finishes. Supply and installation of steel roof frames and supports as required to accommodate the proposed mechanical construction. Note that the conditions vary at each area, and are to be field verified.
d. Patching of building finishes damaged or altered as a result of the work of this contract. Patching shall include, but is not limited to masonry alterations and renovations, and painting of renovated, modified or altered wall and ceiling surfaces.
e. Patching and repair of roofing finishes. The contractor is advised that roof areas impacted by the work of this contract are under warranty. Repairs and alterations to these roof systems must be performed in strict conformation with the written requirements of the roofing system manufacturer, and performed by a roofing contractor pre-qualified by the roofing system manufacturer.
Addenda:
If necessary, an addendum will be issued on or before Friday, January 20, 2023
Pre-Bid Meeting Information
Mandatory: No
Date: Tuesday, January 17, 2023 at 2:00 PM
Location:
Lenape High School
235 Hartford Road
All Participants are required to sign in at Main Office/Walk thru will follow meeting
Medford, NJ 08055
Phone: (609) 268-2000
Document Availability
Available as of: On or Before Friday, December 23, 2022
Cost: $25.00 Non-Refundable - Documents will be distributed electronically by Architect
Payable To: Lenape Regional High School District - MAIL CHECK TO ARHITECT
Return Policy: Non Refundable
Available at:
The Design Collaborative Architects and Planners, PA
1940 Route 9 Norrth
ALL DOCUMENTS WILL BE DISTRIBUTED ELECTRONICALLY VIA ARCHITECT
Cape May Court House, NJ 08210
Phone: 609-465-4111
Bid Submission/Deadline
Bids Due By: Friday, February 3, 2023 at 10:00 AM
Submit Bids to:
Lenape Regional High School District Board of Education
93 Willow Grove Road
Attn: Ms. Kara Huber, Business Admin./Board Secretary
Shamong, NJ 08088
Phone: (609) 268-2000
Planholders
Dodge Data & Analytics - NJ
300 American Metro Blvd
Suite 185
Hamilton, NJ 08619
Phone: 413-930-4166
EACM Corp.
1070 Ocean Avenue
Sea Bright, NJ 07701
Phone: 732-842-4777
Falasca Mechanical
3329 North Mill Road
Vineland, NJ 08360
Phone: 856-794-2010
Gaudelli Bros. Mechanical, Inc.
202 S Wade Blvd.
Millville Industrial Park
Millville, NJ 08332
Phone: 856-825-0636
John C. Kohler Co.
1100 Detweiler Road
Lansdale, PA 19446
Phone: 215-855-7000
Kaser Mechanical, LLC
1150 East Broad Street
Burlington,, NJ 08016
Phone: 609-353-1360
Kisby-Lees Mechanical
610 North New Jersey Avenue
Atlantic City, NJ 08401
Phone: 609-345-3265
LGB Mechanical, Inc.
555 North Route 73
West Berlin, NJ 08091
Phone: 856-719-1400
McCloskey Mechanical Contractors, Inc.
445 Lower Landing Road
Blackwood, NJ 08012
Phone: 856-784-5080
Surety Mechanical Services of NJ LLC
300 Thomas Avenue
Suite 201
Williamstown, NJ 08094-3442
Phone: 856-875-1160
Bid Results